Monday, 4 May 2015


PHOTOS OF PROJECT 




SEWERAGE WORK

VCP pipe 



Setting the vcp ready for excavation work




Excavation work for trenches for laying the vcp pipes
Laying the vcp pipe with bedding of aggregates 

Jointing the vcp pipes


Installation of base slab


Installation of chamber ring



Installation of second chamber ring




Installation of eccentric rest platform


Installation of third chamber ring


Installation of taper top

Backfill 